| For multiple tracks the ballast edge is left in place, on single tracks the ballast edge chamfer can be removed to produce a realistic slope. |
| Track bedding joins and alterations are helped by loose ballast available separately. |
| Laying track bedding is simple and straightforward. Add Styropal-contact glue to the underside of the track bedding and place on baseboard. Drying time is 15-20 minutes whilst gently holding the bedding in place. |
| You can find our products right here in the internet, in our TT catalogue (TT trackbedding) or in our H0 track catalogue (H0 ELITE trackbedding). |
|
|